Motor Truck Logging Methods Part 3

You’re reading novel Motor Truck Logging Methods Part 3 online at LightNovelFree.com. Please use the follow button to get notification about the latest chapter next time when you visit LightNovelFree.com. Use F11 button to read novel in full-screen(PC only). Drop by anytime you want to read free – fast – latest novel. It’s great if you could leave a comment, share your opinion about the new chapters, new novel with others on the internet. We’ll do our best to bring you the finest, latest novel everyday. Enjoy!

ROAD CONSTRUCTION

The question of the kind of road for hauling logs with the motor truck is a very important one. It is impossible to move a fifteen-ton load day in and day out unless there are good roads, and no motor truck operation of reasonably large proportions can be successfully maintained without a road that is well constructed and which will not give way during any kind of weather, under the loads that are carried. One cannot successfully and continuously operate on dirt or even gravel roads as they are good only when dry. Good roads are as important to the motor truck operator as the railroad is to the transportation of logs by rail.

The big handicap in motor truck logging in the past has been poor roads.

The same man who will survey, grade, carefully lay and ballast the steel for a logging railroad will many times put a truck and trailer on a poor dirt road and expect the truck to haul economically and satisfactorily.

A motor truck will haul over some mighty poor apologies for roads but it does not pay. A good road is an excellent investment. It makes larger loads and more trips a day possible, will save on tires and repairs, and will require less gasoline to the mile; the efficiency and output will be increased and the time and operating costs will be decreased.



[Ill.u.s.tration: Sub-grade for motor truck logging road.]

There have been some very successful operators who have secured a small body of timber at a low price on a public road who made the motor truck pay without building a road. This method of logging in a small way will continue to be carried on by small operators who will haul only during three seasons of the year or even less. However, the big future for the motor truck for logging is in the larger tracts of timber where it would not pay to put in a railroad but where a good type of motor truck road can be built cheaply and loads as large as the truck can handle be carried with no road restrictions as to the weight.

In general four types of roads are used by loggers: (1) the cross-plank road, (2) the fore and aft pole road, (3) the fore and aft plank road, and (4) the cement road. The puncheon road is a modification of the fore and aft plank road and will be taken up with the latter. The methods and cost of construction, the advantages and the disadvantages of these various types of roads follow in detail.

_Sub-Grade_: The sub-grade is put in the same way for each type of road.

The average width of the truck is seven feet and six inches, calling for a road about eight and a half feet wide, so that the sub-grade should be twelve feet in width. An ill.u.s.tration of the amount of grading necessary is shown on page 25. Too much care cannot be taken in the matter of ditches for draining. In a rainy climate, the water should be carried away from the hill side of the grade every fifty feet.

_Cross-Plank Road_: The cross-plank road is constructed by laying cull ties on hewn poles lengthwise of the road. Three rows, four feet apart are used and second grade ten foot plank, six inches thick and of random widths, are securely nailed to the ties. Great care must be taken to have the ties laid fairly smooth if the road is to be even. Plank less than six inches in thickness should not be used as the thinner ones very soon crack and go to piece under the excessive jar and vibration.

This is a very expensive road to build as it wastes material. Six thousand feet of lumber is necessary for every hundred foot station, at a cost of $222 a station for the material alone, without considering the cost of laying it. The maintenance cost also is very heavy because the nails pull out as a result of the vibration caused by the truck. This type of road is used only over short stretches, such as swampy ground in connection with the dirt road, and on steep grades and sharp turns in connection with the pole or plank road.

The Esary Logging Company at Camano Island, Was.h.i.+ngton, put in a cross-plank road for a short distance on a sharp curve and a steep grade, to see how it would affect the traction. It was found that cross planking was not necessary on curves where the grade is ten per cent or less when coming down with a load, providing trailer brakes are used. In the future the company will not use this type of road unless grades above this maximum are encountered. It is impossible to lay a cross-plank road smoothly because the stringers settle and make the road b.u.mpy. The resulting jar on the equipment and the fact that these stretches have to be taken at a much reduced speed, furnish ample reason to condemn its use.

The only real use for a cross-plank road is to secure better traction on grades exceeding ten or twelve per cent, and then it should be laid with a s.p.a.ce of about one inch between the planks. Even in such cases it would be better to use some other method for securing traction, such as sanding the track or winding the drive wheels with a light cable. The waste of material and the excessive vibration limit the use of this type of road.

_Fore and Aft Pole Road._ In the fore and aft pole road, poles from twelve to fourteen inches in diameter are hewn on one or more faces and laid longitudinally with the road, with one or more logs for each wheel track. This type of road is commonly used by motor truck loggers and is one that lends itself readily to their use. It is the most practical road that can be built unless there is a small saw-mill handy to saw planks for the fore and aft plank road. The smaller material growing along the right of way is used at an expense of only what it costs to fell it, hew it and put the poles in place. Hemlock poles may be used to advantage.

Some operators use the single large pole placed on cross-ties eight or ten feet apart and use lighter eight-inch poles placed on the outside for a guard rail to keep the truck from leaving the track. The main pole is laid in a ditch about eight inches deep, leaving it half buried. This helps to keep the poles from spreading and increases their firmness and strength. The pole is notched into the cross-ties, which are made of logs not less than eight inches in diameter, and is securely nailed or bolted to prevent it from rolling. The outside guard rail is laid on the surface of the ground close to the main track and is securely braced from the outside by means of posts sunk into the ground or it may be spiked to the main pole or to the ties. When running with the trailer on this narrow type of road, the guard rail is very necessary.

After the poles have been laid, the sub-grade should be ditched in the center deep enough to carry away the water that falls in the middle of the road. The success of the road depends to a large extent upon good drainage.

The Meicklejohn and Brown Logging Company near Monroe, Was.h.i.+ngton, operate over a pole road with three poles for each wheel. The poles are from ten to twelve inches in diameter at the small end and are hewn to a six inch face, giving an eighteen inch bearing surface for each wheel.

(See ill.u.s.tration on page 29.) The minimum sized pole that should be used for roads of this character is one eight inches in diameter at the small end. The road is constructed the same way as the single pole road and the poles are laid on cross ties twelve inches in diameter placed from eight to ten feet apart. Where the road is off the ground as when crossing over a small depression, these sleepers must not be over five feet apart. The guard rails at this operation are held in place by means of a wooden brace nailed from each end of the rail to a near-by stump.

The ends of the poles used for the track are adzed so that they match evenly. By breaking the joints and hewing them the road presents a level surface with no b.u.mps.

In planning the curves, it is necessary to make the tracks somewhat wider than on straight stretches in order to keep the trailer from running off. The track should be three feet wide on sharp curves and provided with a stout guard rail if there is any danger of the truck leaving the track. The curves are banked on the opposite side from that used on railroad curves. That is, the inner rail is raised about three inches. This is to throw the load to the outside away from the inner guard rail, making it easier to make the turn without the rear wheels binding. In this way a 35 degree curve may be negotiated with forty or fifty foot logs. As the curves have to be pa.s.sed at a much reduced speed, there is little danger of the logs rolling off due to the raised inner rail.

The grading for a road of this construction is usually light. The grades should, if possible, be kept below five per cent. A truck will operate better on a ten per cent grade in dry weather than on a five per cent one in wet weather. On a road of this type, grades up to ten per cent can be operated over unless there is snow. When the grades are above this and the weather is wet, traction still may be secured by sanding the road or by tacking an old half inch steel cable to the road in the form of a figure "s". If this is sanded in addition, the truck may safely be taken up a steeper grade than it would be safe to bring it down without sanding.

The pole road could be greatly improved by hewing the faces of the poles where they come together side by side so that an even fit is made. The details of this improved form of construction are shown in figure 1, page 30.

[Ill.u.s.tration: The most common type of motor truck logging road--a fore-and-aft pole road.]

[Ill.u.s.tration: Figure 1. Cross section of pole road. Scale--1 inch equals 2 feet.]

At the present time this is not done and there are one or more ruts in the surface of the road due to the rounding off of the poles where they are placed side by side. The front wheels of the truck are constantly dropping into these ruts, tending to spread the track apart and making it harder for the driver to steer. The tires also suffer from uneven wear. With this deep groove in the track, a certain amount of the traction of the rear wheels is also lost. Hence a much better road would be one with the inner faces of the poles hewn so that a tight fit is secured.

This road can be built of two large poles or three smaller ones to give a flat track two and a half feet wide for each wheel. Laid nearly flush with the ground the guard rail can be eliminated with this width of track, except on sharp curves and other locations where there would be danger if the truck left the track. On such a road the traction will also be increased, better time can be made, the truck will be easier to steer and hence safer to operate, and there will be less wear on the tires. Such a road can be very easily and cheaply built by bringing in a portable sawmill and slabbing the material on two sides to the desired face.

The life of a good pole road is from three to four years if kept in good repair. The maintenance cost is very light if the road is properly constructed in the first place, consisting chiefly in removing a pole here and there that shows signs of too much wear, and in bracing guard rails where they weaken. The use of two or three hewn poles laid lengthwise for each wheel without cross-ties does not pay as the poles soon get out of place even when trenched, and the loss of traction due to the irregularities and of time and money in the upkeep of such a road more than justifies putting in a good road in the first place.

The cost of a fore and aft pole road varies with the accessibility of the material and the cost of the labor. In the past they have been built for as low as $2000 a mile, but with the present prices costs will range from $5000 to $7000 a mile. One company within the year contracted the grading and construction of the road for $70 a hundred foot station, not including the cost of clearing and chunking out the right of way. The total cost was about $125 a station or $6600 a mile.

Some of the advantages of the pole road are that it is tough and strong and does not crack, split or break easily so that if it is properly put in it lasts and requires but little maintenance. The material for its construction is found along the right of way and being small in diameter is less expensive than other road materials.

_Fore and Aft Plank Roads._ This type of road is constructed by placing cross-ties from eight to ten feet apart, center to center, upon which are placed lengthwise for each wheel, two or three sawed timbers not less than six inches in thickness and from twelve to fifteen inches in width. A good road of this type will deliver 150 million feet of logs at a conservative estimate.

The grading is usually light and in many places entirely unnecessary.

Second-grade six by eight ties with the eight inch face placed down, or hewn poles are laid about eight feet apart. Where the road bed is soft, the ties are placed closer and in some places as near as two and a half feet apart. Over very swampy ground, the road known as the fore and aft puncheon road is used. It consists simply of cedar puncheon placed crosswise of the road with the usual planking nailed securely to it. The plank used should never be less than six inches in thickness in the main road as it has been proved that four inch plank very soon give way under the heavy loads. On the spur lines it is practicable to use four inch plank because the road is used only a short time.

The total width of the road is eight feet and the plank are laid on top of the ground, but if they are sunk nearly to the level of the ground the road is made considerably more firm and enduring, and of course is safer. The ends are adzed smooth to present an even surface, drift-bolted to the ties, and all joints broken.

The plank in the track are kept together by means of a three by four inch timber driven tightly between the tracks on top of the cross-ties at each joint, and a block nailed to the outside of the tie at each joint with a wedge-shaped piece of wood driven between it and the plank.

(See ill.u.s.tration on page 33.) This wedge is driven in from time to time as occasion may demand. If, in addition to this construction, dirt or gravel is filled in the center to the level of the track, the road is made very solid.

[Ill.u.s.tration: Fore-and-aft plank road with wedges on cross ties to facilitate the re-aligning of the planks.]

With a good road of this type and a bearing surface of thirty inches, the trouble and expense of a guard rail may be eliminated. When a light truck is used for a small body of timber such a wide and heavily constructed road is not practical. In this case, a four inch plank with a fifteen inch surface and an eight inch pole for a guard rail would be used. Here again the track must be made wider on the sharp curves, often as wide as three and a half feet. Usually, the inner rail is made wider than the outer one. On very sharp curves the track may have to be planked solid to keep the trailer from running off. By sawing out chips from one-half to one inch wide two-thirds of the way through the plank, and about six feet apart on the inner side, a long plank may be bent around quite a sharp curve. The ties, of course, should be placed so as to allow the cut sections of the plank to rest squarely on them. This does away with the short pieces and so strengthens the track.

The company logging at Camano Island, Was.h.i.+ngton, operates over a road of this type, an ill.u.s.tration of which is shown on page 38. The difficulties encountered in the construction of this particular road were very considerable as a cut through very hard shale, in some places as much as seven feet, was necessary. The maintenance on this road is heavier than is usual. Two men are employed to work on it continually.

The work consists of blocking up the loose ties and plank, making any necessary repairs and keeping sand and gravel on the steep grades. The cost of this work is good insurance as it keeps the road in the best of condition at all times and saves on other operating expenses.

[Ill.u.s.tration: Detailed view of fore-and-aft plank road, showing method of wedging.]

_Cost._ The first cost of a road of this type is high but it more than pays in the long run if a large body of timber is to be hauled over it.

The timber used in its construction amounts to about 160 thousand feet per mile. Second grade material can be used at a cost of approximately $5,500 a mile for the plank. The total cost per mile varies from $6,000 to $8,000. The plank road at Camano Island cost $20,000 for two and three-quarter miles, which includes the cost of the plank, the grading and labor of putting the plank in place. This is at the rate of about $7,275 a mile, or approximately $138 a hundred foot station. The overhead charge for the road at this operation is $.75 a thousand feet of timber hauled over it. Plank roads of lighter construction have been built for $4,000 a mile. The length of life is about the same as that of a pole road, three to four years.

The fore and aft plank road is one of the best roads that can be put in where the timber is of sufficient quant.i.ty to justify the expense. The big advantage is the speed that can be made and the saving in the equipment. Such a road is very free from b.u.mps and the jar and vibration on the truck is no greater than on a city pavement. The depreciation on a truck depends to a great extent upon the road operated over. With the above type, depreciation on the truck will not be less than five years.

In addition, tire mileage will be double that obtained over a pole road, and the gasoline and repair expense will be very materially cut. Owing to the very small vibration, a load of logs can be brought to the landing as fast as it is safe to let the truck glide on a down grade.

Speeds as high as 20 miles an hour can easily be taken without excessive vibration. The traction is greater on this type of road than it is on the pole road, due to the greater bearing surface. Traction on grades up to 12% is easily secured by sanding the plank.

_Concrete Roads._ Concrete has been suggested as an ideal road material.

However, up to the present time, loggers have not been very enthusiastic about this type of road on account of the cost of construction, which is somewhat more expensive than the other types of roads, and on account of the permanence of the finished road which is beyond that needed. To the writer's knowledge, there is no company operating in the Northwest over a concrete road of their own building. In the future such roads may be used to a limited extent on the main haul by companies which have operations extending over at least a five year period. The spur roads will probably always be of some other material.

In building such roads two tracks of concrete, one for each wheel are provided. The sub-grade should be well ditched in the center with cross ditches every fifty feet, as is done with the pole road. It has been suggested that the ditches holding the track be six inches deep and twenty-six inches wide. They are filled to the top with concrete and built with a lip four inches high and four inches wide along the outside on top of the main surface to serve as a guard rail. No forms are necessary except for the guard lip.

A word of caution here may not be amiss. Concrete roads of this nature must be regarded as only experimental, for no specific data are available for determining the proper section of concrete to be used for carrying heavy loads on so narrow a bearing surface. It is evident that the carrying capacity of such strips of concrete would be greatly affected by the character of the sub-base. It will therefore be impossible to specify a standard that can be used under all conditions.

The use of the concrete guard rail is one of the disadvantages of this road. The edges of the rail cannot be made rounding except by special forms and the rubbing of the tires against this rough surface would greatly reduce the tire mileage. In addition, the rail is so exposed to weather and hard wear that it cannot be relied upon to serve effectively for any great length of time. The placing of forms is also a considerable item of expense in building such a road. A method which would eliminate such an expense and at the same time provide a more practical rail would be an advantage.

[Ill.u.s.tration: Figure 2. Cross section of concrete road. Scale--1 inch equals 2 feet.]

It has already been said that guard rails are unnecessary with a thirty inch track except on sharp curves and otherwise dangerous places.

However, where rails are necessary the wooden rail fastened by bolts embedded in the concrete as ill.u.s.trated above, is quite effective and readily installed. This consists of a four by six inch plank placed on edge and drift-bolted to the concrete every three to five feet by a three-quarter inch bolt. These bolts are placed in the concrete when it is poured and should be embedded six inches. This will provide a rail less expensive to build than a concrete rail and one which will last longer and save on tires. Replacements are easily made by removing the nuts and placing a new plank in place of the old. With a guard rail of this type, there is left a twenty-six inch track for the wheels to run in.

Experiments by W. D. Pence (Journ. West. Soc. Eng. Vol. VI, 1901, Page 549) on 1:2:4 concrete give an average value of 0.0000055 inches per degree Fahrenheit for the coefficient of expansion. The richer the concrete, the greater the change in dimension. Due to the expansion, in laying the concrete the track must be broken every twenty-five or thirty feet by placing a half-inch board in the ditch when the concrete is being filled in. Later this board is removed and the joint filled with asphalt so that the concrete may expand without danger of cracking the road.

_Cost._ The best mix to use in building this road is what is known as the 1:2:5. For one cubic yard of concrete, the following amounts of materials will be used for the above mix: 1.21 barrels of cement, 0.46 cubic yards of sand, and 0.92 cubic yards of stone. At the present prices, the cost for the materials for this road is about twenty cents a cubic foot or about $4,400 a mile. The total cost of the road including the necessary grading, ditching and labor, will be from $7,000 to $9,000 per mile.

Motor Truck Logging Methods Part 3

You're reading novel Motor Truck Logging Methods Part 3 online at LightNovelFree.com. You can use the follow function to bookmark your favorite novel ( Only for registered users ). If you find any errors ( broken links, can't load photos, etc.. ), Please let us know so we can fix it as soon as possible. And when you start a conversation or debate about a certain topic with other people, please do not offend them just because you don't like their opinions.


Motor Truck Logging Methods Part 3 summary

You're reading Motor Truck Logging Methods Part 3. This novel has been translated by Updating. Author: Frederick Malcolm Knapp already has 552 views.

It's great if you read and follow any novel on our website. We promise you that we'll bring you the latest, hottest novel everyday and FREE.

LightNovelFree.com is a most smartest website for reading novel online, it can automatic resize images to fit your pc screen, even on your mobile. Experience now by using your smartphone and access to LightNovelFree.com

RECENTLY UPDATED NOVEL