You’re reading novel The Story of the Cambrian Part 6 online at LightNovelFree.com. Please use the follow button to get notification about the latest chapter next time when you visit LightNovelFree.com. Use F11 button to read novel in full-screen(PC only). Drop by anytime you want to read free – fast – latest novel. It’s great if you could leave a comment, share your opinion about the new chapters, new novel with others on the internet. We’ll do our best to bring you the finest, latest novel everyday. Enjoy!

CHAPTER VI. THE BATTLE OF ELLESMERE.

"_The question of a railway is now or never_."--THE LATE MR. R. G.

JEBB, of Ellesmere.

No period, since the wild days of the "railway mania," was more pregnant of schemes than the later months of 1860. They sprang up like mushrooms all along the Shrops.h.i.+re border, and some of them, like mushrooms, as suddenly suffered decay. A facetious Salopian prophet ventured publicly to predict that "we shall hear next of a railway to Llansilin (a remote village among the border hills) or the moon." His ratiocination was hardly exaggerated. A "preliminary prospectus" was actually published for carrying a railway, at a cost of under 10,000 pounds per mile, from Shrewsbury, through Kinnerley and Porthywaen, thence "near Llanfyllin and Llanrhaiadr," to Llangynog, "through the Berwyn hills" to Llandrillo, and so to Dolgelley and Portmadoc. It was to be worked and maintained by the West Midland, Shrewsbury and Coast of Wales Railway Co.; the prospects of mineral and pa.s.senger traffic were "most promising," and throughout its entire length of 90 miles, the promoters pointed out with all the emphasis which italics can afford, "it has _only one tunnel_, and that slightly exceeding a mile and half in length." Eventually, a line, partly following this route, under the less comprehensive t.i.tle of the West Shrops.h.i.+re Mineral Railway, and later known as "the Potteries,"

constructed from a station in Abbey Forgate, Shrewsbury, to Llanymynech, and on to Nantmawr, with a branch from Kinnerley to Criggion, ran for a time, then fell into abeyance and disrepair, and was in recent years re-opened under the Light Railways Act as the Shrops.h.i.+re and Montgomerys.h.i.+re Railway, an independent company.

But, in its original form, the undertaking was apparently to be no friendly compet.i.tor with the existing Oswestry and Newtown and a.s.sociated lines, whose ambition it had, for some time, been to extend its northern terminus, resting on the Great Western branch at Oswestry, through Ellesmere to Whitchurch, there to form a more serviceable junction with the London and North Western from Shrewsbury to Crewe, and the busy hives of Lancas.h.i.+re. But more formidable opposition was already afoot elsewhere. The Great Western, none too eager, as we have seen, to a.s.sist independent undertakings in Montgomerys.h.i.+re, were ready enough to capture traffic in other quarters, and their answer to the Oswestry and Whitchurch project was to formulate a scheme for a branch from Rednal to Ellesmere, with incidental hints about constructing a loop to place Oswestry on their main line. Draughtsmen were busy everywhere with pens and plans. Public halls echoed to the optimistic eloquence of promoters and counter promoters, and powder and shot was being hurriedly got together for the tremendous fusilade in the Parliamentary committee rooms, where, for many a long day, there was to rage and sway the battle for the rights and privileges of bringing the steam engine into the little town of Ellesmere.

For, though wider schemes were involved in the struggle, Ellesmere was the pivot on which arguments and contentions centred. In such a conflict, needless to say, all the old rivalries of "leviathan"

interests, of which we have already heard so much, re-emerged. What was still called the "Montgomerys.h.i.+re party"--the men who had brought the other local railways into existence in spite of well-nigh overwhelming difficulties--continued to look for a.s.sociation with the North Western for greater salvation. Others favoured the chance of obtaining increased facilities for through traffic from the Great Western. Between the two warring elements, Ellesmere itself, as one of its most estimable and influential citizens had put it, believed it was "now or never" for them.

In the Parliamentary Committee Rooms, where the evidence occupied thirteen days, and counsels' speeches several more, the two projects were stubbornly fought out. Great Western witnesses came forward to aver that, owing to the haste with which the Shrewsbury and Chester Railway had been projected, Oswestry had been left too much in the lurch, and the time was now come for reconsideration of its claims to be brought on to the main line. Mr. Sergeant Wheeler, with all the command of forensic eloquence, drew visions of the Shrops.h.i.+re market town as "a great central place of meeting for the people all round." All that was necessary was to build a line from Oswestry to Rednal, and then the projected branch from Rednal to Ellesmere, and Rednal itself might become a second Rugby or Crewe; who could tell? As to the continuation of such a line from Ellesmere to Whitchurch, true, Paddington was not enthusiastic, but when they found that that was the price demanded for any measure of local support, they were ready to pay it.

In Oswestry there was, naturally enough, a general approval of any step which would place the town on the Great Western main line, and no small point was made of the fact that it would be better to have one station than two. Moreover, Mr. R. J. Croxon. whose words were weighted with the influence of a family solicitor, private banker and town clerk, was of opinion that, apart from anything else, to carry a line, as Mr. Whalley proposed, for two miles by the side of the turnpike to Whittington would be "very dangerous to people driving along," and the attention of the Trustees ought to be called to it. But, unfortunately for Mr. Croxon and those who shared his fears in this regard, it was the business of the local surveyor to examine the plans, and he was "engaged on the other side." Thus even among Oswestrians was opinion divided between the rival routes, and men like Alderman Thomas Minshall and Alderman Peploe Cartwright, who had stood shoulder to shoulder in the fight for independent interests in the making of the Oswestry and Newtown Railway, were now inclined to regard each others' sympathies with some suspicion.

Further down the proposed line the weight was thrown rather more decisively in favour of the Whalley scheme. Whitchurch had pet.i.tioned against the Great Western proposals, though Captain Cust, who gave evidence for the larger company, was moved to dismiss this effort as the work of "Captain Clement Hill and lot of ragam.u.f.fins." Attempts were even made to disparage the local undertaking by reference to Mr. Savin, who had agreed to carry out the line on similar terms of lease already adopted elsewhere, as a "haberdasher, not in a position to subscribe millions towards railway projects." In Ellesmere the argument that the Great Western scheme would bring the agricultural area into close touch with the North Wales coalfields was quickly answered by the counter-plea that the independent company could also build a branch from that spot to Ruabon or Wrexham, and powers to that effect "would be applied for as soon as what may be called the main line from Oswestry to Whitchurch was carried." Even the larger landowners through whose estates the rival engineers had marched with their instruments differed in their point of approach. Sir John Kynaston, Bart., of Hardwicke, near Ellesmere, who, as someone said, "if he had been left alone, was willing, like Marcus Curtius, to sacrifice himself for the public good, was brought and instructed to give evidence about embankments," one of which, on Mr.

Whalley's line, by the way, it was supposed (though in error) would shut out his view of the Vale of Llangollen, and "destroy the happiness of his existence for the remainder of his days." Sir John Hanmer, Bart., M.P., on the other hand, was inclined to become rhapsodic. He looked upon a railway "as a fine work of art," which any painter might be glad to include in his landscape--only, of course, it must not cut off a landed proprietor from his woods and his other wild grounds, as the Great Western scheme proposed to do, and against this he not only objected but pet.i.tioned.

[Picture: The late CAPT. R. D. PRYCE, Chairman of the Cambrian Railways Co., 1884-1886; The late HON. GEORGE T. KENYON, M.P., First Chairman of the Wrexham and Ellesmere Railway Co.]

In the end the Committee declared the preamble of the Montgomerys.h.i.+re party, for their Oswestry, Ellesmere, and Whitchurch Railway to be proved, and that of the Great Western not proved, though the Chairman regretted to add that the finding was not unanimous. In the lobbies rumour had it that it was, in fact, only arrived at by the casting vote of that gentleman himself. Be that as it may, it sufficed. Once again "independent" effort, astutely engineered, had triumphed over the all-powerful interests of a great and wealthy company, and amongst those who had hoped and feared and hoped again for the success of the Oswestry Ellesmere and Whitchurch scheme enthusiasm knew no bounds.

In Ellesmere a great and excited crowd awaited news from London at the Bridgewater Hotel. They watched for the omnibus from Gobowen, which it was expected might bear the fateful tidings. But either the omnibus failed to arrive, or, if it did, it had no intelligence to impart.

Shortly afterwards, however, a special messenger came post haste along the road from Oswestry, and in a moment the news flashed through the little town. "Victory"! An attempt was made to ring the bells, but the churchwarden could not be found, and no one else had authority to pull the ropes. So that the concourse fell back on the time-honoured procession, and led by a drum and fife band, and headed by the Bailiffs, the cheering throng paraded the streets while cannon booming from the market place startled the countryside for a mile or more around.

Oswestry, a.s.sembled in public meeting, put to flight its town clerk's gloomy prognostications with hilarious speeches, and outside the more dignified civic circles popular demonstration took still more picturesque form.

The return of a number of witnesses who had gone up to London to give evidence against the local scheme and in support of the Great Western was awaited at the Oswestry station by a hostile crowd. Some delay in their arrival home was occasioned by an untoward incident even before they finally left London. Seating themselves in a first-cla.s.s compartment in the rear of the train at Paddington, they waited at first patiently and then impatiently for it to start. At last, unable to understand the delay, one of them put out his head and asked a pa.s.sing official when the train was going. "It _has_ gone" was the laconic reply. The coach which they had chosen was not attached to the rest of the train, and they were not so meticulously careful about examining tickets on the Great Western system as they are to-day. When the belated pa.s.sengers did eventually reach Oswestry, the crowd was still there. What was more, they had had time to organise what was deemed a suitable reception. Among the witnesses was a gentleman who, it appeared, had at one time been very short of pence, and, it was alleged, had left his abode without paying the rent. Somehow or another this little fact had been raked up and a number of wags had cut the shape of a latch-key out of a sheet of tin.

As he alighted from the train this was dangled before him at the end of a long pole, with a pendant inscription, "Who left the key under the door?"

The promoters of the new undertaking, of which Mr. George Lewis became first secretary, with offices in Oswald Chambers, Oswestry, had every reason for satisfaction. Royal a.s.sent was given to their Bill in August, 1861, authorising a capital of 150,000 pounds in 10 pound shares, with 50,000 pounds on loan, the work to be completed within five years. There were, however, still tough battles to be waged over subsequent efforts to obtain sanction for certain deviations and extensions, against which the Great Western continued to fight tooth and nail with a counter-offensive of their own. No fewer than three distinct schemes were now before the public, with all sorts of loops and junctions at Rednal or Mile End, near Whittington, and branches from Bettisfield to Wem, or to Yorton, and from Ellesmere to Ruabon. But it is an easier task to draw plans on a map than to carry them out. The Wem branch never matured, the link with Denbighs.h.i.+re only after many years, and then to Wrexham and not Ruabon.

So far as the main issue was concerned, however, the Great Western again failed to prove their preamble, and another signal was given for local rejoicings over the result. Not only at Oswestry and Ellesmere and other places along the route of the new line, but as far afield as Montgomery and Llanfyllin, where a branch line of their own was being promoted to Llanymynech, hats were thrown into the air and healths were drunk to the victory for local enterprise. Oswestry parish church bells rang for two days, and the Rifle Corps band blew itself dry outside the houses of Mr.

Savin, Mr. George Owen and others. Mr. Savin himself, returning from London, during these proceedings, met "with a reception at Oswestry such as no man ever received before." Carried shoulder high through the streets of the town, accompanied by a surging throng of cheering admirers, armed with torches, to the tune of "See the Conquering Hero comes," he was addressed in congratulatory vein by several of his fellow-citizens, and it was only when a first and second attempt to fly from the embarra.s.sment of so tumultuous a welcome had failed, that he succeeded, on a third, in making his escape. The "small haberdasher,"

who had been deemed incapable of organising railway schemes, had indeed become something very like a railway king!

But we are antic.i.p.ating events. At the end of August, 1861, the first sod had been cut at Ellesmere, where it was proposed to begin the construction, proceeding first in the direction of Whitchurch. The ceremony was performed by Sir John Hanmer and Mr. John Stanton, in a field belonging to Mr. W. A. Provis, "not far from the workhouse," and a spade and barrow, suitably inscribed, was presented to Sir John by Messrs. Savin and Ward, the contractors. There was the usual ceremonial, inclusive of banqueting and speech-making, and banners, emblazoned with such appropriate mottoes as "Whalley for ever," "Hurrah for Sir John Hanmer and John Stanton, Esquire," floated in the breeze. One ingenious gentleman, elaborating the topical theme, had erected a flag which, we are told, "attracted special attention from its significance and quaintness," representing a donkey cart with two pa.s.sengers on one side and a steam engine and carriages on the other, to personify "Ellesmere of yesterday," and "Ellesmere of to-day," with the philosophic addendum, "Evil communications corrupt good manners," "Aye, says the preacher, every valley shall be raised and every hill shall be brought low." "Aye, says the teacher, let us bless the bridge that carries us safely over,"

"Aye, aye, quoth honest nature." The application to evil communications might, in such a connection, be a little ambiguous, but presumably n.o.body imagined it to refer to the Oswestry, Ellesmere and Whitchurch Railway!

The allusion to bridges was rather more germane; for, in building the line towards Whitchurch, which was the first section taken in hand, the engineers were faced with a bridging problem of a peculiar nature, and only less in magnitude than that which had confronted the constructors of the famous Liverpool and Manchester Railway thirty years earlier. Partly in order to avoid interfering with Sir John Hanmer's property, and partly because they deemed it the better way, the engineers decided to carry the line over Whixall Moss, a wide area of bog land lying between Bettisfield and Fenns Bank. This, it was supposed, might even be drained by making the railway across its quivering surface, but hopes of this sort were not to be realised, for it remains to-day a wild, but picturesque stretch of heather and silver birches, where the peat-digger plies his trade with, perhaps, as much profit as the farmer would in tilling it. But as to its power to bear the weight of pa.s.sing trains the engineers had little doubt. The ca.n.a.l already crossed it, and though in making soundings the surveyors once lost their 35 foot rod in the mora.s.s, this, was near the ca.n.a.l bank, and it did not deter them in their efforts to discover a means of securing the railway from similar disaster. The average depth of the moss was found to be twelve feet, but there were areas where it was only nine feet deep, and at most 17 feet, and when the bottom was reached it was discovered to be sand.

So, proceeding merrily, Mr. George Owen first drained the site of the line by means of deep side and lateral drains filled with brushwood and grig. He then laid strong f.a.ggots three feet thick and from eight to twelve feet long, and over these placed a framework of larch poles extending the entire width of the rails. The poles were then interlaced with branches of hazel and brushwood and upon this the sleepers and rails were laid, the whole being ballasted with sand and other light material.

And, in the end it proved a triumph for courage and ingenuity. Though there might be some slight oscillation, heavy trains have been running over this interesting two or three mile stretch for many a long year without the slightest mishap.

Not to be outdone by little Ellesmere, another "first sod" was turned at Oswestry on September 4th, 1862, by Miss Kinchant of Park Hall, and Miss Lloyd, daughter of the Mayor of the borough, on the Shelf Bank field, hard by the existing terminus of the Oswestry and Newtown Railway, with which the new line was to be connected. The streets were in gala dress, and while the leading citizens fared sumptuously on the Wynnstay Arms bowling green, and disported themselves at a "rural fete," tea was served to "the poorer women of the town and neighbourhood." In addition to the residents many came from Ellesmere in wagons drawn by a decorated traction engine,--significant emblem of the new power which was shortly to bring the two neighbouring and ever friendly places within a quarter of an hour's distance of each other.

Work now went ahead on both sections of the line, under the personal supervision of Messrs. Thomas and John Savin and Mr. John Ward, and by the spring of 1863 the railway was ready for traffic over the eleven miles between Ellesmere and Whitchurch. The honour of being the first pa.s.sengers to make the journey belongs, appropriately enough, to the late Capt. Jebb and his company of Rifles, who, by courtesy of the contractors, were driven to Whitchurch on April 20th, a few other friends accompanying them. The official trial trip was made shortly after, in a train drawn by "two heavy engines," the "Montgomery" and the "Hero," and in crossing Whixall Moss, we are told, "the deflection was almost inappreciable." Captain Tyler was now able to pa.s.s the line as entirely satisfactory, and, early in the morning on the first Monday in May, a little group of Ellesmerians a.s.sembled at their new station to witness the first regular train leave for Whitchurch. No doubt their hearts swelled with pride, but beyond the usual exhibition of such emotion as so notable an event inspired, there was no public acclaim.

Another twelve months were to elapse before the remaining section, from Ellesmere to Oswestry, was ready for traffic. In July 1864, however, this link was forged, and the event synchronizing with the completion of the work at the other end of the chain, from Borth to Aberystwyth, it threw open the whole length of what was about to become, under the Consolidation Act, the main line of the Cambrian Railways.

[Picture: Advertis.e.m.e.nt for the Ceremony of Cutting the First Sod]

CHAPTER VII. THE COAST SECTION.

"_When they saw the Crimean Campaign they seemed about to be engaged in against the sea, he thought it had been very much to the advantage of the Welsh Coast line, if, on the formation of the Board the Directors had been put through a series of questions in early English history, and if their engineer had been directed to report to them on the maritime events of the reign of Canute_."--EDWARD, THIRD EARL OF POWIS.

No Chapter in the story of the Cambrian is more intimately touched with the spirit of romance, none more prolific of pathetic humour, than that which concerns what is to-day termed the Coast Section. For the moment, however, all was suns.h.i.+ne and success. The continuation of the line from Borth to Aberystwyth was completed for traffic, as we have just seen, in the summer of 1864, and on that auspicious day when trains began to run through from Whitchurch to the new terminus on the banks of the Rheidol the rejoicings in Aberystwyth were such as to eclipse even those who had marked earlier stages of the construction of the various railways now linked in one long chain. Indeed, the triumphal procession which made its way to the coast was bent on more than one celebration. The day was also to mark the opening of the hotel which Mr. Savin had built at Borth, and when the train finally arrived at Aberystwyth at a quarter past three it was accorded a civic welcome; the Mayor, Mr. Morgan, and Corporation tendering to Messrs. Thomas and John Savin an address, in which thanks were poured out upon these "benefactors" to the locality. A move was then made to the promenade, where Mrs. Edwards drove the first pile in the new pier, and, after much processioning, the great a.s.sembly sat down at the Belle Vue Hotel for a banquet of which, surely, the like has never been seen in the town since! Here his Wors.h.i.+p, supported by Earl Vane, Capt. E. L. Pryse, M.P., Mr. Thomas Barnes, M.P., Capt. R. D. Pryce, the Contractors, Engineers, and many other ardent workers for or well-wishers of the undertaking, presided over a flow of oratory, the report of which occupied over five columns of the newspapers, and visions of a new Aberystwyth swam before the eyes of the guests, wonderful and beatific!

Such, indeed, was the sumptuousness of the repast, and the wealth of oratory, that it was eleven at night before the company could be persuaded to take their places in the return train, and at three o'clock the next morning a jovial party arrived home at Oswestry, tired and sleepy, though happy and glorious.

But the "Crimean campaign" of girdling the coast of Merioneths.h.i.+re and penetrating onward to the distant peninsula of Lleyn, which was part of the Aberystwyth and Welsh Coast scheme, was yet only in its earlier stages, and already the difficulties of the undertaking had had their sobering effects. The original idea of Mr. Piercy was to build a huge bridge from Ynyslas across the estuary of the Dovey to Aberdovey, whence it was proposed to run a service of steam boats to Ireland. Work was begun with seeking a foundation in the s.h.i.+fting sands. Men were engaged with the boring rods, but they could only labour at low tide, and in the long intervals when the water was high, adjacent hostelries afforded a too attractive method of spending enforced leisure, so that often, it is said, when the waters had receded enough to renew operations, some of the borers were too bemused to know whether they were on the solid earth or not. At any rate, no sure foundation could be found, either by Philip drunk or by Philip sober, and it was reluctantly concluded that another means of bridging the gulf must be sought.

Adopting the wise Tennysonian counsel, the promoters eventually decided to "take the bend," and Parliamentary power was sought for this deviation of the original scheme. It was opposed by the Great Western Railway as inimical to their project of carrying a line from Bala to Barmouth and so forming a connection with the Welsh Coast, and their antagonism was only disposed of after a compromise had been made in the Parliamentary Committee Room, by which the great company obtained power to build the bridge themselves, if they wished, within ten years, and the tolls on the deviation were to be charged only for the same distance as if the traffic had been carried by the bridge. So the line was carried round to cross the Dovey at a narrow point near Glandyfi and connect the coast line with the other railway there.

Hence the existence of, perhaps, the most beautifully situated of all railway stations, formerly called Glandovey Junction, but changed in recent years to Dovey Junction to avoid confusion with the adjacent Glandovey station, at the same time transformed into Glandyfi. Being only intended for changing trains the station is peculiar in having no exit, and the very few pa.s.sengers who ever alight here for other purposes than entering another train have, presumably to make their way as best they can along the line. Another feature of this station is that its buildings and adjuncts lie in three counties. The station itself is in Montgomerys.h.i.+re. The stationmaster's house, just over the river bridge is in Merioneth, and from the signalbox the signalman works an up distant signal which is planted in the soil of Cardigans.h.i.+re!

But this connection only came later, in August 1867, when the six miles of line from Aberdovey to the Junction was carried along the estuary sh.o.r.e and through the four tunnels which, until the Mid-Wales Railway was absorbed in 1904, remained the only ones on the whole system. For a considerable time after the coast line was opened pa.s.sengers were carried from Aberdovey by ferry to Ynyslas. At high tide the boat could make for the station, but when the water was low it berthed on the Cardigans.h.i.+re side, at a lower landing place, whence travellers and baggage proceeded by a little branch into Ynyslas station.

The first sod on the Merioneths.h.i.+re side had been cut, in April 1862, by Mrs. Foulkes of Aberdovey, on the Green near the Corbett Arms Hotel at Towyn, without formal ceremony, but in the presence of Mr. Piercy and Mr.

Savin, and "a few scores of persons who cheered l.u.s.tily." We may hope that even this mild demonstration did something to hearten the promoters in their herculean task. For several miles along the sh.o.r.e the line had to be protected against the a.s.sault of the high tides that periodically sweep Cardigan Bay, and it was soon only too evident that ordinary ramparts were no sure b.u.t.tress against Atlantic rollers. More than once the permanent way was washed by the waves and engineer and contractor, viewing the dismal wreckage, must have felt that n.o.ble references to the moral of Canute, however pungent, were not altogether inapropos.

There were toilers at this work, however, who had never heard of the Danish King and bode not of what the maritime history of England might teach. To them the arrival of the first trial train on the banks of the Dysynni was more pertinently an occasion for "celebration," and sixty pounds being quickly collected for the purpose, and as quickly spent, rumour has it that, alas! the festivities ended for some in a few reflective hours, we may hope profitably, if not too comfortably, spent in the local lock-up.

But even when the Dysynni had been safely bridged,--not without anxious days when piles refused to become embedded in the s.h.i.+ngly bed of the river--the troubles of the constructors were far from concluded. Beyond Llwyngwril, to which the line was opened for traffic in November, 1863,--the engines and coaches had been brought by barge across the Dovey from Ynyslas--there lay a still more formidable barrier to rapid progress. For the cliffs hereabouts, which, with their steep declivity down to the rock-strewn sh.o.r.e, left scarcely a foothold for the wandering mountain sheep, were enough to daunt the heart of any but the most courageous and determined engineer. Here, again, the problem rose as to whether they should be tunnelled or the line carried along their sloping edge, supported by sea-walls, as was the high road above. But the high road itself shaved the edge of the precipice so closely that, it is related, in the old coaching days, many people preferred leaving the vehicle at the top of the hill to swinging down such a slope. Eventually choice fell on the latter alternative, sailors being employed to a.s.sist in the work by reason of their greater experience on such seagirt ledges!

It was, indeed, a hazardous venture; for the extreme narrowness of the ground to work upon, sometimes tapering away to practically no ground at all, hampered the task at every step, and the difficulty of building a track along which heavy trains could run at high speed was never quite surmounted. Even to-day trains descending the 1 in 60 decline are carefully regulated in speed, no bad arrangement, after all, since this stretch of line commands, on a clear day, one of the finest peeps of the whole charming panorama of scenery along the coast of North Wales.

But engineer and contractor had something better to do than admire the view. Below them and beyond, even when Barmouth Junction was reached in July, 1865, there lay another obstacle which could not be avoided by any but the widest detour. Trains could, and were eventually carried around the narrow neck of the Dovey; they must cross the estuary of the Mawddach almost at its widest point in order to gain the Barmouth sh.o.r.e.

Meanwhile, the line was carried along the southern bank of the river, by what is now the Dolgelley branch, to Penmaenpool, and the public had to remain content with such facilities as this localised service could provide.

And a wonderful service it appears to have been! Old inhabitants still tell tales of how goods trains would pull up at remote wayside spots while driver and guard went trapping hares that made good prices in the neighbouring markets, where no inconvenient questions were asked concerning their capture. Or it might be that, now and again, a waggon load of beer barrels was consigned to some village inn. It was then the business of those in charge so to marshal the train that the "stuff" was placed in convenient proximity to the engine, and, in the seclusion of some cutting, a halt would be made for some mysterious reason. To clamber over the tender into the adjacent waggon was a simple matter.

Still simpler, in expert hands, was the process of forcing up the hoop of one of the barrels, tapping it and drawing it till the engine bucket foamed alluringly, then plugging it up again, and drawing back the hoop into its original position. On delivery the consignee might complain of short weight, but that it was a question for the brewer and the company to settle as best they could. None of the running staff knew anything about it; and, as for the lateness of the train, well, was any train ever punctual in those days, and who bothered about half an hour's delay?

Besides, there was something more important to bother about. Actions in Chancery had begun to distract the attention of worried directors, and these r.e.t.a.r.ded progress with the construction of the line. So it was not until June 1869 that the Cambrian continued beyond Penmaenpool, and, even when Dolgelley was eventually approached, pa.s.sengers had to alight at a platform some little distance from the town. Only when the Great Western Railway from Ruabon was completed did the trains from Barmouth Junction run into Dolgelley station proper.

Many and difficult as were the engineering problems involved in the construction of the coast line none aroused greater interest or put scientific skill and courage to a severer test than that, to which we have already briefly alluded, of carrying the railway over the sand and river current into Barmouth. To the lay mind it appeared an almost insuperable task, and there were those who did not hesitate to whisper their doubts as to its practicability, one well-known local gentleman being reported to have gone as far as publicly to undertake to eat the first engine which ever crossed that formidable gulf. But engineers and craftsmen set to work with a will, and before long what had appeared an impossibility was rapidly taking shape as an actuality. Eight hundred yards in length, the greater portion was constructed on timber piles, over 500 in number, in 113 spans, driven into the sand. The navigable channel, at the Barmouth end, was crossed by an iron-work construction, of seven fixed and one opening span. The latter was of the drawbridge type, and when lifted at one end by means of large screws was carried on wheels and could be drawn back over the adjoining span.

It was a lengthy as well as a c.u.mbersome operation, and when, in 1899, the ironwork portion of the viaduct had become too weak for the constantly increasing loads of developing traffic, it was completely renewed with a modern steel structure of four spans, one of which was a spring span, revolving on the centre pier and giving two clear openings.

The piers carrying the girders are formed of columns 8ft. in diameter sunk through the sand down to solid rock, which was reached at a depth of about 90 feet below high water mark. The columns are steel cylinders filled with concrete, and were sunk into position by means of compressed air on the diving bell principle, and owing to the depth below water at high tide, the men excavating inside were finally working under a pressure of three atmospheres, or 45 lbs. to the square inch. The contractors were the Cleveland Bridge and Engineering Co. Ltd., of Darlington. In 1906, and the following two or three years, the timber portion of the viaduct was also completely renewed in the same material, the contractor in this case being Mr. Abraham Williams of Aberdovey, who had built, or helped to build, many of the old wooden bridges on the coast line. The total cost of the renewals was approximately 60,000 pounds, and it is no small achievement that they were carried out without a moment's stoppage in the traffic.

[Picture: Barmouth Bridge. Reproduced from the "Great Western Magazine."]

But even the original viaduct, old-fas.h.i.+oned as it may seem now, was a wonder in those days, and the fact that it carried (and still carries) a footpath as well as the railway, provides Barmouth with a promenade unrivalled in character and in range of panorama of river and mountains and sea anywhere in this country. For a time before it was completely finished a carriage was drawn over the bridge by horses, but in 1867 it was opened for regular traffic, and in the first train which crossed it into Barmouth rode the gentleman, who was under contract to make a meal of the locomotive. If he had forgotten his rash undertaking, he was very soon to receive a startling reminder. On safe arrival on the northern sh.o.r.e, the story goes, he was politely escorted by an official to a table laid for one, and was courteously requested to elect whether he would have the engine roast or boiled. Alas! for the frailty of human nature, more especially where a sense of humour might stand us in good stead.

The sceptic, disillusioned, is stated to have failed to appreciate the joke!

Once the estuary was bridged, north of Barmouth, the constructional problems were simpler of solution, and when the contractors reached Minffordd, they were able to take advantage of an earlier engineering enterprise, no less remarkable than any railway building. In former days the sea had covered what is now called the Traeth, the broad valley of the Glaslyn, stretching from the hillocks of Penrhyndeudraeth to Moel-y-Gest, overlooking Portmadoc. The tides then surged several miles up this vale, and washed the walls of Llanfrothen churchyard, while vessels bore their freights almost up to Pont Aberglaslyn. In 1791 Mr.

The Story of the Cambrian Part 6

You're reading novel The Story of the Cambrian Part 6 online at LightNovelFree.com. You can use the follow function to bookmark your favorite novel ( Only for registered users ). If you find any errors ( broken links, can't load photos, etc.. ), Please let us know so we can fix it as soon as possible. And when you start a conversation or debate about a certain topic with other people, please do not offend them just because you don't like their opinions.


The Story of the Cambrian Part 6 summary

You're reading The Story of the Cambrian Part 6. This novel has been translated by Updating. Author: C. P. Gasquoine already has 637 views.

It's great if you read and follow any novel on our website. We promise you that we'll bring you the latest, hottest novel everyday and FREE.

LightNovelFree.com is a most smartest website for reading novel online, it can automatic resize images to fit your pc screen, even on your mobile. Experience now by using your smartphone and access to LightNovelFree.com

RECENTLY UPDATED NOVEL